Kitty tortillas! <[log in to unmask]>
Date:
Tue, 9 Sep 2003 23:09:37 EDT
Content-Type:
multipart/alternative
Parts/Attachments:
text/plain (764 bytes) , text/html (2126 bytes)
In a message dated 9/9/2003 7:50:38 PM Eastern Daylight Time,
[log in to unmask] writes:
there i painted you a word picture
     Furnish as submitted
     Furnish as corrected
     Revise and resubmit
 X  Rejected.

NFG.  Cannot review or accept on basis of the above submittal.  Contractor,
you are directed to submit 1) Manufacturer's Shop Drawing [not less than full
scale, considering small size of item] showing proposed construction, 2)
Manufacturer's sample of proposed item, or 3) submit specified item.

Ralph L. Walter, AIA 09/09/03

bcc Memo to Owner:   Contractor again clearly fails to comply with Contract
Documents.  Advise you immediately declare Contractor in default, to avoid
further delays and cost overruns, in addition to increased costs of Professional
Services During Construction.