Subject:
From:
John Callan <[log in to unmask]>
Reply To:
"Let us not speak foul in folly!" - ][<en Phollit
Date:
Mon, 5 May 2003 08:40:37 -0500
Content-Type:
multipart/alternative
Parts/Attachments:
text/plain (1234 bytes) , text/enriched (2852 bytes)
Rudy,

"Sand" took me by surprise.

How about this.  The left hand number is not a number, its an S, for 
"slab".  Thus one also finds PS, for Porch Slab, and B stands for Beam. 
  The number on the right indicates which slab design it is.

Now all I have to do is figure out where the slab design details have 
gone.

Thanks.

-jc


On Monday, May 5, 2003, at 07:58  AM, Rudy Christian wrote:

>  
>
> >>Below is a drawing. Sorry if it bloats
>
> your email. I'm confused by the numbers in the centers of the
>
> structural bays. Is it reasonable that they represent the thickness of
>
> the slab spanning two ways between the beams? Why two numbers? Is the
>
> second number the depth of the beam? Or is the first number...always a
>
> "5", actually an "S" as in Slab?<<
>
>  
>
> I would hope they didn't pour 15 to 22 inches of concrete in some of 
> those bays! Looking at the pattern my guess would be the average depth 
> of “sand(?)” needed to establish the level fill before the floor was 
> poured.
>
>  
>
> >>Has anyone ever written a book on how to interpret the notes of long
>
> gone draftsmen? Particulary the ones in the engineering profession?<<
>
>  
>
> Hell, it’s hard enough to understand those of engineers today!
>
>  
>
> Sign me “Only admit I are one among friends”
>
>  
>