Hon R. P. Adams,
Couldn't agree more with your insistence on proper spelling, even if your EIFS
standards are a little off.....
One of the problems we found with EIFS was there were no details for anything
as mundane as flashing and weeps from the Mfr, so none from archts, so none
from fabricator's shop dwgs, so guess what: none were included. Nor could we
figure out any way to design or fabricate such details in the non-space
between the sheetrock and Styrofoam. We also found problems with the sealant
pulling the lamina away from the Styrofoam.
How did you come up with details for this, uh, material? And, by all means,
congratulations for having used it successfully!
Ralph
|
|
|