Mime-Version: |
1.0 (Apple Message framework v552) |
Sender: |
|
Subject: |
|
From: |
|
Date: |
Mon, 5 May 2003 08:40:37 -0500 |
In-Reply-To: |
<000001c31306$096177e0$0000fea9@mainframe> |
Content-Type: |
multipart/alternative; boundary=Apple-Mail-9-820393551 |
Reply-To: |
|
Parts/Attachments: |
|
|
Rudy,
"Sand" took me by surprise.
How about this. The left hand number is not a number, its an S, for
"slab". Thus one also finds PS, for Porch Slab, and B stands for Beam.
The number on the right indicates which slab design it is.
Now all I have to do is figure out where the slab design details have
gone.
Thanks.
-jc
On Monday, May 5, 2003, at 07:58 AM, Rudy Christian wrote:
>
>
> >>Below is a drawing. Sorry if it bloats
>
> your email. I'm confused by the numbers in the centers of the
>
> structural bays. Is it reasonable that they represent the thickness of
>
> the slab spanning two ways between the beams? Why two numbers? Is the
>
> second number the depth of the beam? Or is the first number...always a
>
> "5", actually an "S" as in Slab?<<
>
>
>
> I would hope they didn't pour 15 to 22 inches of concrete in some of
> those bays! Looking at the pattern my guess would be the average depth
> of “sand(?)” needed to establish the level fill before the floor was
> poured.
>
>
>
> >>Has anyone ever written a book on how to interpret the notes of long
>
> gone draftsmen? Particulary the ones in the engineering profession?<<
>
>
>
> Hell, it’s hard enough to understand those of engineers today!
>
>
>
> Sign me “Only admit I are one among friends”
>
>
>
|
|
|