In a message dated 5/2/2001 4:29:44 PM Eastern Daylight Time, [log in to unmask]
writes:
<< I was told yesterday about a restoration project that one of our mechanics
completed with a prior employer where they installed a tile roof in such a
manner that the metal flashings, which are not expected to last as long as
the tile, can be replaced without need to remove tile. >>
Do we think the Owner paid enough extra in labor to build removable flashings
to equal the cost of using the right material the first time?
Ralph
Ralph